• Project Name: Renovation of Water Treatment Facility , KJO, Al-Khafji
  • Project Title: Renovation of Water Treatment Facility
  • Location: Al-Khafji
  • Capacity: 21,800m3/day
  • Technology: Conventional
  • Scope of Work: Renovation of the existing Water Treatment Facilities (WTF) at Al-Khafji Joint Operations (KJO). The renovation will include the addition of Surge facilities to remove excess oil and suspended solids from the incoming streams (by providing 2 Surge Tanks and oil removal system) and providing H2S stripper for incoming sour stream and to replace other downstream transfer and high pressure injection pumping facilities. Including the engineering, procurement, construction, inspection, testing, training of O&M personnel, pre-commissioning, commissioning and performance testing of the new water treatment facilities.
  • SETE’s Role: Engineering, procurement, construction and project management